Nottingham City Hospital Coronary Heart Disease Unit
The design of this £14m four storey steel frame Coronary Heart Disease Unit provides the hospital with 60 intensive care recovery units, four operating theatres including two catheter laboratory theatres.
Works included the design and construction of an elevated 100m single storey link bridge, an enabling contract to demolish existing buildings and divert services, and the construction of a new energy centre.
Services: structural engineering, civil engineering.